Made available by
Touch N' Go Systems, Inc., and the
Law Offices of James B. Gottstein.
You can also go to The Alaska Legal Resource Center or search the entire website search.
An operator of a well or pool that produces hydrogen sulfide gas shall install, operate, and maintain surface production equipment in conformance with API RP 55, Recommended Practices for Oil and Gas Producing and Gas Processing Plant Operations Involving Hydrogen Sulfide, 2d edition, February 15, 1995, which is adopted by reference.
History: Eff. 11/7/99, Register 152
Authority: AS 31.05.030
Editor's note: A copy of the American Petroleum Institute recommended practices referred to in 20 AAC 25.290 may be reviewed during business hours at the commission's office and may be obtained from the American Petroleum Institute, Order Desk, 1220 L Street, N.W., Washington, D.C. 20005-4070, or if not available from the American Petroleum Institute, may be obtained from Global Engineering Documents, 15 Inverness Way East, Englewood, CO 80150.
Note to HTML Version:
The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.
If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.
Last modified 7/05/2006