20 AAC 25.287. Well control requirements for wireline operations

(a) This section applies to workover or service operations performed with slickline or conductor line with the tree in place. These operations are also subject to the requirements of 20 AAC 25.527.

(b) Well control equipment must include

(1) a set of wireline rams suitable or sized for each diameter of wire passing through the wireline valve;

(2) a lubricator or pressure deployment system; and

(3) a high pressure pack-off, stripper, or greasehead with linewiper, stripper, or pack-off.

(c) The rated working pressure of the well control equipment must exceed the maximum potential surface pressure to which it may be subjected. If an approved Application for Sundry Approvals (Form 10-403) is required under 20 AAC 25.280, the commission will specify in that approved application the working pressure that the equipment must be rated to meet or exceed. However, the rated working pressure of an annular type preventer need not exceed 5,000 psi.

(d) The operator shall test the well control equipment as follows:

(1) at least once a week, equipment must be function pressure-tested, using a non-compressible fluid, to the required working pressure specified in an approved Application for Sundry Approvals under 20 AAC 25.280 or, if that application is not required, to the maximum potential surface pressure to which that equipment may be subjected;

(2) after each installation of the well control equipment, that equipment must be pressure-tested, before wellbore entry, to the maximum potential wellhead pressure to which that equipment may be subjected;

(3) if the wireline valve rams have been used, repaired or changed, the wireline rams must be closed and function pressure-tested before wellbore entry, using a non-compressible fluid, to the required working pressure specified in an approved Application for Sundry Approvals under 20 AAC 25.280 or, if that application is not required, to the maximum potential surface pressure to which they may be subjected.

(e) The operator shall post in the operator's cab a copy of the approved Application for Sundry Approvals, if that application is required under 20 AAC 25.280, any geologic hazard information obtained while drilling the well, and a copy of the operator's standing orders specifying well control procedures.

(f) Upon request of the operator, the commission will, in its discretion, approve a variance from the requirements of this section if the variance provides at least an equally effective means of well control.

History: Eff. 11/7/99, Register 152

Authority: AS 31.05.030


Note to HTML Version:

The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.

If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.

Last modified 7/05/2006