(a) The provisions of 3 AAC 52.600 - 3 AAC 52.690 apply to all electric utilities participating in the power cost equalization program established in AS 42.45.100 - 42.45.190.
(b) The purposes of 3 AAC 52.600 - 3 AAC 52.690 are to establish criteria for the determination of power cost equalization per kilowatt-hour and to encourage economic and efficient practices by participating electric utilities.
(c) Unless otherwise required under AS 42.05 or AS 42.45, a requirement in 3 AAC 52.600 - 3 AAC 52.690 may be modified or waived, in whole or in part, by order of the commission and a showing of good cause or on the commission's own motion. An applicant shall file and the commission will consider an application in accordance with 3 AAC 48.805. In considering an application, the commission will consider a participating electric utility's size, location, and accessibility, and other local conditions.
History: Eff. 10/28/89, Register 112; am 5/18/96, Register 138; am 9/11/2004, Register 171
Authority: AS 42.05.141
Note to HTML Version:
The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.
If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.
Last modified 7/05/2006