(a) The effective tariff of an electric utility must delineate and authorize interconnection and purchases and sales of electric power between an electric utility and a qualifying facility including, but not limited to, provisions for
(1) the charges, terms, and conditions for interconnection to a qualifying facility, including the method and timing of payment of interconnection charges by a qualifying facility;
(2) the rates, terms, and conditions for purchases of firm and non-firm power from a qualifying facility; and
(3) the rates, terms, and conditions for sales of power to a qualifying facility.
(b) Not later than 60 days after receipt of a written request for interconnection from a qualifying facility, an electric utility shall file with the commission for its consideration a tariff for interconnection, purchases, and sales with the requesting qualifying facility in accordance with applicable provisions of AS 42.05.361 - 42.05.441, 3 AAC 48.200 - 3 AAC 48.390, and 3 AAC 50.750 - 3 AAC 50.820.
(c) Notwithstanding (a) and (b) of this section, an electric utility may enter into a special contract with a qualifying facility specifying the charges, rates, terms, and conditions of interconnection, purchases, and sales between an electric utility and a qualifying facility, provided use of a special contract otherwise conforms to applicable commission regulations.
(d) Not later than 60 days after the effective date of 3 AAC 50.750 - 3 AAC 50.820, each electric utility shall compile and maintain for public inspection upon request the current data and information specified in 3 AAC 50.770(d) (1) and (e)(1)(A) - (e)(1)(C). and a schedule setting forth all current tariff and special contract purchase rates with qualifying facilities.
(e) By January 14, 1983, each electric utility shall submit to the commission for inclusion in its tariff, standard rates for the purchase of non-firm electric power from qualifying facilities with a design capacity of 100 kilowatts or less. These purchase rates must be based on the utility's avoided costs is determined under 3 AAC 50.770(d) .
History: Eff. 11/20/82, Register 84
Authority: AS 42.05.141 (a)
AS 42.05.151 (a)
Note to HTML Version:
The Alaska Administrative Code was automatically converted to HTML from a plain text format. Every effort has been made to ensure its accuracy, but neither Touch N' Go Systems nor the Law Offices of James B. Gottstein can be held responsible for any possible errors. This version of the Alaska Administrative Code is current through June, 2006.
If it is critical that the precise terms of the Alaska Administrative Code be known, it is recommended that more formal sources be consulted. Recent editions of the Alaska Administrative Journal may be obtained from the Alaska Lieutenant Governor's Office on the world wide web. If any errors are found, please e-mail Touch N' Go systems at E-mail. We hope you find this information useful. Copyright 2006. Touch N' Go Systems, Inc. All Rights Reserved.
Last modified 7/05/2006