|
|
|
- Alaska Statutes.
- Title 36. Public Contracts
- Chapter 30. State Procurement Code
- Section 150. Bid Acceptance and Bid Evaluation.
previous:
Section 140. Bid Opening.
next:
Section 160. Late Bids; Correction or Withdrawal of Bids; Cancellation of Awards.
AS 36.30.150. Bid Acceptance and Bid Evaluation.
- (a) Bids shall be unconditionally accepted without alteration or correction, except as authorized in AS 36.30.160
. The procurement officer shall evaluate bids based on the requirements set out in the invitation to bid, which may
include criteria to determine acceptability such as inspection, testing, quality, delivery, and suitability for a
particular purpose. The criteria that will affect the bid price and be considered in evaluation for award must be
objectively measurable, such as discounts, transportation costs, and total or life cycle costs. The invitation to bid
must set out the evaluation criteria to be used. Criteria may not be used in bid evaluation if they are not set out in
the invitation to bid.
- (b) [Repealed, Sec. 11 ch 37 SLA 1993].
All content © 2008 by Touch
N' Go/Bright Solutions, Inc.
Note to HTML Version:
This version of the Alaska Statutes is current through December, 2007. The Alaska Statutes were automatically converted to HTML from a plain text format. Every effort has been made to ensure their accuracy, but this can not be guaranteed. If it is critical that the precise terms of the Alaska Statutes be known, it is recommended that more formal sources be consulted. For statutes adopted after the effective date of these statutes, see, Alaska State Legislature
If any errors are found, please e-mail Touch N' Go systems at E-mail. We
hope you find this information useful.